Gliderol GREY ALUMINIUM (RAL9007) Industrial Insulated 95mm Steel Roller Door

Code: IRD-GREY ALUMINIUM
  • Now From £2,539.00 (inc. VAT)
Item in Stock   |   Usually dispatched within 24 hours
Loading...
Door Width = Opening width. Door Height = Opening height.

Gliderol’s 95mm steel industrial roller doors are manufactured to the highest specification. Fully UK-CA CE certified. Although strong, they are lighter than most insulated steel roller doors due to our specially designed double-walled profiles. The door runs quietly due its curved profile design, available in 11 coloured coatings. A zinc-magnesium surface finish achieves significant corrosion protection and durability. These automatic doors are supplied with a high spec GFa motor and TS971 control box. You can choose a row of vision windows that are inserted within the lath. Windows are made of clear double glazed acrylic.


When ordering an industrial roller door you should enter your structural opening sizes.

  • You need a minimum of 310mm side room at the motor side and 230mm on the non-motor side.
  • 540-640mm headroom is required for the full curtain roll depending on your door height.

Before we manufacture this industrial roller door we will provide you with a CAD drawing to approve. We manufacture bespoke made-to-measure industrial roller doors to any specification including Burglar resistance, Gunfire and Terrorism protection roller doors. If you don’t find what you need, contact us directly for a bespoke quotation.

Garage Doors - UK mainland delivery only, excludes certain Scottish Highland postcodes. Please ensure the road access is suitable for a Heavy Goods Vehicle and there is suitable space to park safely to offload your door.

We operate a 1 driver delivery service. Our driver will require assistance from someone able-bodied to help unload the door to an appropriate place which is not an excessive distance from the delivery truck.


Garage Door Parts - are dispatched within 1 working day and delivered by DPD or Royal Mail.

Single Skin Roller Doors - usually delivered within 5 - 14 working days by our inhouse team of delivery drivers.

Insulated Roller Doors - usually delivered within 5 - 14 working days by our inhouse team of delivery drivers.

Up & Over Doors - usually delivered within 6 weeks by our inhouse team of delivery drivers.

Side Hinged Doors - usually delivered within 8 weeks by our inhouse team of delivery drivers.

Insulated Side Hinged Doors - usually delivered within 8 weeks by our inhouse team of delivery drivers.

Sectional Doors - usually delivered within 8 weeks by our inhouse team of delivery drivers.

Industrial Sectional Doors - usually delivered within 6 weeks by our inhouse team of delivery drivers.

Entrance Doors - usually delivered within 2 weeks by our inhouse team of delivery drivers.

Fire Doors - usually delivered within 4 weeks by our inhouse team of delivery drivers.

Gates - usually delivered within 3-4 weeks by our inhouse team of delivery drivers.

 

Returns

All garage doors are made to order. Once manufactured cancelations or returns can not be accepted.