Gliderol Box stiffener for insulated doors

Code: 5617
  • 13,40 â‚¬ (inc. VAT)
  • Delivery from 5,57 â‚¬ (inc. VAT)
Item out of Stock   |   Usually dispatched within 24 hours
Loading...

Box stiffener for insulated doors. A box stiffener will strengthen a half or full box on an insulated door.

Ideal for double doors or where the box is subject to strong winds.

Garage Doors - UK mainland delivery only, excludes certain Scottish Highland postcodes. Please ensure the road access is suitable for a Heavy Goods Vehicle and there is suitable space to park safely to offload your door.

We operate a 1 driver delivery service. Our driver will require assistance from someone able-bodied to help unload the door to an appropriate place which is not an excessive distance from the delivery truck.


Garage Door Parts - are dispatched within 1 working day and delivered by DPD or Royal Mail.

Single Skin Roller Doors - usually delivered within 5 - 14 working days by our inhouse team of delivery drivers.

Insulated Roller Doors - usually delivered within 5 - 14 working days by our inhouse team of delivery drivers.

Up & Over Doors - usually delivered within 6 weeks by our inhouse team of delivery drivers.

Side Hinged Doors - usually delivered within 8 weeks by our inhouse team of delivery drivers.

Insulated Side Hinged Doors - usually delivered within 8 weeks by our inhouse team of delivery drivers.

Sectional Doors - usually delivered within 8 weeks by our inhouse team of delivery drivers.

Industrial Sectional Doors - usually delivered within 6 weeks by our inhouse team of delivery drivers.

Entrance Doors - usually delivered within 2 weeks by our inhouse team of delivery drivers.

Fire Doors - usually delivered within 4 weeks by our inhouse team of delivery drivers.

Gates - usually delivered within 3-4 weeks by our inhouse team of delivery drivers.

 

Returns

All garage doors are made to order. Once manufactured cancelations or returns can not be accepted.